Analysis and siting

Site analysis and siting

Understanding the lot before designing the house.

Before the first line

A home's position is decided only once

Once the foundations are poured, the orientation, views and drainage are fixed for the life of the building. That is why we read the lot before drawing anything. We identify what constrains the site and what works in its favour, then position the home accordingly. This step costs little compared with what it prevents.

Home site being prepared in the fall: two excavators clear and level the pad, survey tripod and siting stakes in place, stone blocks pushed to the edge of the woods
The location set on the lot · survey, stakes and levelling
What we study

Six factors that determine siting

Orientation

The sun's path determines where to place the living spaces, the windows and the outdoor areas. It is the first lever of a passive solar home.

Topography

The slope dictates the siting level, the height of the foundations and the volume of excavation to plan for.

Access

The entrance, parking and service road have to work in winter, not just on paper.

Views

Each opening is oriented toward what is worth seeing, and away from what is not.

Drainage

Surface water runoff is planned before excavation. Corrected after the fact, it is expensive.

Constraints

Setbacks, shoreline buffers, easements and municipal bylaws are identified before the first line is drawn.

Technical, economic and regulatory assessment

Feasibility analysis

Each project undergoes a three-part analysis. On the technical side, we check the lot's capacity to support the desired structure. On the economic side, we estimate projected construction costs, taking into account what the site imposes: a steep slope or difficult soil does not cost the same as a flat lot. On the regulatory side, we confirm compliance with local planning standards. This step reduces risks before they become costly.

Once the siting is settled and feasibility confirmed, the house plans can be designed on solid ground.